Pan Global Resources Inc. is pleased to provide an exploration update from its 100%-owned Escacena Project in the Iberian Pyrite Belt of southern Spain, including expansion of the project area, a helicopter geophysics survey at Escacena South, commencement of Phase 2 drilling at the Cañada Honda copper-gold deposit, encouraging results from recently completed geophysical and geochemistry surveys, and continued advancement of exploration targets across the Project.

“Escacena continues to grow as a district-scale copper exploration project, with a significantly expanded land position, more than 15 priority targets and a fully funded 20,000-meter drill program planned over the next 12-to-18 months to systematically test the Company’s growing pipeline of targets,” said Tim Moody, President and CEO of Pan Global Resources.

“A new phase of drilling has commenced at Cañada Honda, where previous drilling intersected significant copper-gold mineralization on only a small portion of a three kilometer-long target. Recent geophysical and geochemical surveys have generated additional drill targets and continue to highlight the potential for new discoveries across the broader Escacena Project.”


Escacena Project Expansion and New Exploration Programs
Three new mineral rights applications (total 2,853 hectares) have been submitted adjacent to the Company’s highly prospective Escacena South area. Together with the recently awarded Escacena South area, the applications expand the Escacena Project area to approximately 16,745 hectares.

A helicopter electromagnetic and magnetic survey is scheduled to commence in July across much of the Escacena South area to accelerate target prioritization and assist in identifying concealed sulphide mineralization.

Exploration permitting continues to advance across Escacena South. The Trinidad and Carmen targets, where historical mine workings and surface massive sulphide occurrences coincide with prominent gravity anomalies, have been identified as priority drill targets once final permits are received.

Figure 1 – Escacena Project gravity anomaly map showing Cañada Honda, La Romana, Escacena South (expanded) and priority exploration targets

image001 2

Phase 2 Drilling Commences at Cañada Honda

A new phase of drilling has commenced at the Cañada Honda deposit, comprising an
initial eight drillholes totalling approximately 2,500 meters. The program is designed to test extensions to known copper and gold mineralization and newly identified geophysical and geochemical anomalies.

Cañada Honda is associated with a 3 km-long coincident gravity and Helicopter Electro Magnetic (“HEM”) resistivity-low anomaly located 4 km north of the Company’s La Romana copper-tin-silver deposit. Previous drilling comprised 16 widely spaced drillholes, focussed primarily on the eastern portion of the target, leaving most of the target untested.

Previous drilling intersected significant copper and gold mineralization in multiple holes (January 30, 2024 media release, September 8, 2023 media release), including:

  • 20.0 m grading 0.5% Cu and 0.8 g/t Au, including 5.1 m grading 1.3% Cu and
    0.5 g/t Au (CHD05)
  • 20.0 m grading 1.1 g/t Au (CHD09); and
  • 5.6 m grading 1.15% Cu (CHD10).

Subsequent drilling demonstrated continuity of mineralization from surface to at least 600 meters down-dip, and mineralization remains open at depth and along strike.

Assay results from the current drill programs will be released as they become available.

Geophysical and Geochemical Surveys Generate New Drill Targets
Recent high-resolution SQUID IP and Audio Magnetotelluric (“AMT”) surveys completed over a portion of Cañada Honda have identified several new drill targets adjacent to the modelled gravity anomaly. These surveys provide an opportunity to detect mineralization at greater depths compared to conventional IP.


Coincident chargeability-high and resistivity-low anomalies are interpreted to represent favourable zones for sulphide mineralization and support the potential for a more extensive mineralized corridor as well as provide additional targets for the current drill program.


Additional SQUID IP and AMT survey coverage is planned across the remainder of the 3 km-long anomaly to further refine drill targeting.

Expanded soil geochemistry has also identified multiple untested gold anomalies associated with known mineralization and fault corridors extending across the broader Cañada Honda and El Pozo trend. Follow-up exploration is underway.

Results from recent drilling at El Pozo, including a narrow high-grade polymetallic interval (Table 1) and multiple sulphide-bearing intervals associated with strong chlorite-sericite alteration, support the increasing prospectivity of this corridor and a large untested gravity anomaly north of the current drill area.

Figure 2 – Cañada Honda and El Pozo gravity anomalies showing SQUID IP and AMT anomalies and drillhole locations (see Figure 3

Captura de pantalla 2026 06 29 a las 18.49.49

Figure 3 – SQUID IP cross-section (Line CH4) highlighting high chargeability
drill targets adjacent to the gravity anomaly

Captura de pantalla 2026 06 29 a las 18.50.50

Figure 4 – Soil gold geochemistry and priority target areas across the Cañada
Honda and El Pozo corridor

Captura de pantalla 2026 06 29 a las 18.51.56

Next Steps

  • Ongoing Phase 2 drilling at Cañada Honda
  • Follow-up testing of newly identified geophysical and geochemical targets
  • Completion of the helicopter EM and magnetic survey at Escacena South
  • Advancement of permitting of Escacena South for initial drill testing at the Trinidad and Carmen targets
  • Continued evaluation of additional priority targets across the expanded Escacena Project area

Table 1 – Assay results from PZD04 include:

Captura de pantalla 2026 06 29 a las 18.54.04

Table 2 – El Pozo Drillhole Collar Information

Captura de pantalla 2026 06 29 a las 18.55.53
Captura de pantalla 2026 06 29 a las 18.56.06

About the Escacena Project, Southern Spain

The Escacena Project, recently added Escacena South area and new application areas, together comprise a mineral rights land package covering more than 16,745 hectares controlled 100% by Pan Global in the east of the Iberian Pyrite Belt, Europe’s second-largest copper-producing region. Escacena is located near the operating mine at Riotinto (Atalaya) and is immediately adjacent to the former Aznalcóllar and Los Frailes mines where Minera Los Frailes (Grupo México) is commencing a new underground mine development beneath the former Los Frailes open pit mine. The Escacena Project includes Mineral Resource Estimates at the La Romana copper-tin silver and Cañada Honda copper-gold deposits and hosts 15 other prospective targets for follow-up.

About Pan Global Resources

Pan Global Resources Inc. is actively exploring for copper-rich mineral deposits along with gold and other metals. Copper has compelling supply-demand fundamentals and outlook for strong long-term prices as a critical metal for global electrification and energy transition. Gold is also attracting record prices.
The Company’s flagship Escacena Project, hosting La Romana and Cañada Honda copper-tin-gold mineral resources, is in the prolific Iberian Pyrite Belt in southern Spain, where a favourable permitting track record, excellent infrastructure, mining and professional expertise, and support for copper as a Strategic Raw Material by the European Commission collectively define a tier-one low-risk jurisdiction for mining investment. The Company’s second project, at Cármenes in northern Spain, is an area with a long mining history and excellent infrastructure. The Pan Global team comprises proven talent in exploration, discovery, development, and mining operations. Pan Global Resources is committed to operating safely and with utmost respect for the environment and our partnered communities. The Company is a member, and operates under the principles, of the United Nations Global Compact.

To learn more about Pan Global Resources, please visit the Company’s Curation Connect showcase and explore AI-generated responses to your enquiries at https://app.curationcorp.com/company/Pan-Global-Resources-44037?utm_source=pg_mediareleases

Qualified Persons

Álvaro Merino, Vice President Exploration for Pan Global Resources and a qualified person as defined by National Instrument 43-101, has approved the scientific and technical information for this media release. Mr. Merino is not independent of the Company.

Sampling, QA/QC and Analytical Procedures

Core size was HQ (63mm) and all samples were ½ core. Nominal sample size was 1m core length and ranged from 0.5 to 2m. Sample intervals were defined using geological contacts with the start and end of each sample physically marked on the core. Diamond blade core cutting and sampling was supervised by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples and Certified Reference materials inserted every 25 samples in each batch.

Samples were delivered to certified and accredited ALS laboratory in Seville, Spain and assayed at the ALS laboratory in Ireland. All samples were crushed and split(method CRU-31, SPL22Y) and pulverized using (method PUL-31). Gold, platinum and palladium analysis was by 50 g fire assay with ICP finish (method Au-ICP-24) and multi element analysis was undertaken using a 4-acid digest with ICP AES finish (method ME-ICP-61). Over grade base metal results were assayed using a 4-acid
digest ICP AES (method OG-62).

The soil geochemistry survey includes samples collected from the top 20cm from surface (un-sieved, weighing approx. 1kg) on a 100m x 40m grid across the target areas. Samples were submitted to ALS laboratory in Seville for preparation by method PREP-41. Samples are sieved through a 180-micron mesh screen to remove a large portion of the quartz sand and sent to ALS in Ireland for geochemical analysis using Au-ICP22 (Au; 50g fire assay). More than 2% of the samples submitted to the laboratory include blanks, Certified Reference standards and field duplicates to ensure the compliance with QA/QC protocols of Pan Global Resources. ALS also undertakes its own internal QA/QC analysis to ensure proper sample preparation and equipment calibration.

FOR MORE INFORMATION PLEASE CONTACT

Jason Mercier, VP Investor Relations and Communications
jason@panglobalresources.com / investors@panglobalresources.com
Tel: +1-236-886-9518
www.panglobalresources.com

Forward-looking statements

Statements which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. It is important to note that actual outcomes and the Company’s actual results could differ materially from those in such forward-looking statements. The Company believes that the expectations reflected in the forward-looking information included in this media release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward looking information should not be unduly relied upon. Risks and uncertainties include, but are not limited to, economic, competitive, governmental, environmental, and technological factors that may affect the Company’s operations, markets, products, and prices. Readers should refer to the risk disclosures outlined in the Company’s Management Discussion and Analysis of its audited financial statements filed with the British Columbia Securities Commission.

The forward-looking information contained in this media release is based on information available to the Company as of the date of this media release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.


Pan Global Resources Inc. se complace en ofrecer información actualizada sobre las actividades de exploración en su proyecto Escacena y su expansión al sur: un estudio geofísico aeroportado en Escacena Sur, el inicio de la fase 2 de perforación en el yacimiento de cobre y oro de Cañada Honda, los alentadores resultados de los estudios geofísicos y geoquímicos recientemente completados, y el avance continuado de los objetivos de exploración en todo el Proyecto 

«Escacena sigue creciendo como proyecto de exploración de cobre a escala de distrito, con una superficie considerablemente ampliada, más de 15 objetivos prioritarios y un programa de perforación de 20.000 metros, con financiación completa, previsto para los próximos 12 a 18 meses con el fin de evaluar de forma sistemática la creciente cartera de objetivos de la empresa», ha declarado Tim Moody, presidente y CEO de Pan Global Resources. 

«Se ha iniciado una nueva fase de perforación en Cañada Honda, donde los sondeos anteriores intersecaron una importante mineralización de cobre y oro en sólo una pequeña parte de un objetivo de tres kilómetros de longitud. Recientes estudios geofísicos y geoquímicos han identificado nuevos objetivos de perforación y siguen poniendo de relieve el potencial de nuevos descubrimientos en todo el proyecto Escacena».

Ampliación del proyecto Escacena y nuevos programas de exploración

Se han presentado tres nuevas solicitudes de derechos mineros (por un total de 2.853 ha) adyacentes a la zona de Escacena Sur de la empresa, que presenta un gran potencial. Junto con la zona de Escacena Sur, recientemente adjudicada, estas solicitudes amplían la superficie del proyecto Escacena a aproximadamente 16.745 ha. 

Está previsto que comenzar en julio un estudio electromagnético y magnético aeroportado en gran parte de la zona sur de Escacena, con el fin de acelerar la priorización de objetivos y ayudar a identificar mineralización de sulfuros oculta. 

La tramitación de los permisos de exploración sigue avanzando en toda la zona de Escacena Sur. Los objetivos de Trinidad y Carmen, donde las explotaciones mineras históricas y los yacimientos de sulfuros masivos en superficie coinciden con anomalías gravitatorias destacadas, se han identificado como objetivos prioritarios de perforación una vez que se reciban los permisos definitivos.

Figura 1 – Mapa de anomalías gravitatorias del proyecto Escacena, en el que se muestran Cañada Honda, La Romana, Escacena Sur (ampliado) y los objetivos prioritarios de exploración

image001 2

Comienza la fase 2 de perforación en Cañada Honda

Se ha iniciado una nueva fase de perforación en el yacimiento de Cañada Honda, que comprende ocho sondeos iniciales con una longitud total de aproximadamente 2.500 metros. El programa está diseñado para explorar las extensiones de la mineralización asociados a una marcada alteración de clorita y sericita, respaldan el creciente potencial de este corredor y una gran anomalía gravitatoria aún sin explorar al norte de la zona de perforación actual.

Figura 2 – Anomalías gravitatorias de Cañada Honda y El Pozo, en las que se muestran las anomalías SQUID IP y AMT, así como la ubicación de los sondeos (véase la figura 3)

Captura de pantalla 2026 06 29 a las 18.49.49

Figura 3 – Sección transversal de SQUID IP (línea CH4) en la que se destacan los objetivos de perforación de alta cargabilidad adyacentes a la anomalía gravitatoria

Captura de pantalla 2026 06 29 a las 18.50.50

Figura 4 – Geoquímica de suelos para oro y zonas objetivo prioritarias a lo largo del corredor de Cañada Honda y El Pozo

Captura de pantalla 2026 06 29 a las 18.51.56

Próximos pasos

  • Perforación de la fase 2 en Cañada Honda en curso. 
  • Pruebas de seguimiento de los objetivos geofísicos y geoquímicos recientemente identificados 
  • Finalización del estudio electromagnético y magnético realizado desde helicóptero en Escacena Sur 
  • Avances en la tramitación de los permisos de Escacena Sur para los primeros sondeos en los objetivos Trinidad y Carmen 
  • Evaluación continuada de objetivos prioritarios adicionales en toda la zona ampliada del proyecto Escacena

Tabla 1: Los resultados de los ensayos de PZD04 incluyen:

Captura de pantalla 2026 06 29 a las 18.54.04

Tabla 2 – Información de emboquilles de «El Pozo»

Captura de pantalla 2026 06 29 a las 18.55.53
Captura de pantalla 2026 06 29 a las 18.56.06

Sobre el Proyecto Escacena en el Sur de España

El Proyecto Escacena, al que se han añadido recientemente la zona de Escacena Sur y se han solicitado nuevas áreas, conforma globalmente un conjunto de terrenos con derechos mineros que abarca más de 16.745 hectáreas, controladas al 100 % por Pan Global, en el este de la Faja Pirítica Ibérica, la segunda región productora de cobre más grande de Europa. Escacena se encuentra cerca de la mina en explotación de Riotinto (Atalaya) y linda directamente con las antiguas minas de Aznalcóllar y Los Frailes, donde Minera Los Frailes (Grupo México) está iniciando el desarrollo de una nueva mina subterránea bajo la antigua mina a cielo abierto de Los Frailes. El proyecto Escacena incluye estimaciones de recursos minerales en los yacimientos de cobre, estaño y plata de La Romana y de cobre y oro de Cañada Honda, y alberga otros 15 objetivos prospectivos para su seguimiento.

Sobre Pan Global Resources

Pan Global Resources Inc. desarrolla activamente actividades de exploración enfocadas en depósitos ricos en cobre, además de oro y otros metales. El cobre presenta sólidos fundamentos de oferta y demanda y perspectivas favorables a largo plazo debido a su papel esencial en la electrificación global y la transición energética. El oro también se encuentra en niveles de precios históricamente elevados. 

El proyecto insignia de la empresa, Escacena, que alberga los recursos minerales de cobre, estaño y oro de La Romana y Cañada Honda, se encuentra en la prolífica Faja Pirítica Ibérica, en el sur de España, donde un historial favorable en materia de permisos, una infraestructura excelente, experiencia profesional y en minería, y el apoyo de la Comisión Europea al cobre como materia prima estratégica definen en conjunto una jurisdicción de primer nivel y bajo riesgo para la inversión minera. El segundo proyecto de la empresa, en Cármenes, en el norte de España, es una zona con una larga historia minera y una excelente infraestructura. El equipo de Pan Global está compuesto por profesionales de probada solvencia en exploración, descubrimiento, desarrollo y operaciones mineras. Pan Global Resources se compromete a operar de forma segura y con el máximo respeto por el medio ambiente y las comunidades con las que colabora. La empresa es miembro del Pacto Mundial de las Naciones Unidas y opera de acuerdo con sus principios.

Para obtener más información sobre Pan Global Resources, visite el perfil de la empresa en Curation Connect y explore las respuestas generadas por IA a sus consultas.

Persona cualificada

Álvaro Merino, vicepresidente de Exploración de Pan Global Resources y persona cualificada según la definición del Instrumento Nacional 43-101, ha aprobado la información científica y técnica incluida en este comunicado de prensa. El Sr. Merino no es independiente de la compañía.

Muestreo, QA/QC y procedimientos analíticos

El diámetro de los testigos ha sido HQ (63 mm) y todas las muestras eran de ½ testigo. El tamaño nominal de la muestra era de 1 m de longitud testigo y oscilaba entre 0,5 y 2 m. Los intervalos de muestreo se definieron utilizando contactos geológicos, con el inicio y el final de cada muestra marcados físicamente sobre el testigo. El corte y muestreo fue supervisado en todo momento por personal de la empresa. Se tomaron muestras duplicadas de ¼ de testigo aproximadamente cada 30 muestras y se incluyeron materiales de referencia certificados cada 25 muestras en cada lote. 

Las muestras se enviaron al laboratorio de ALS en Sevilla y se analizaron en las instalaciones de ALS en Irlanda. Todas las muestras se trituraron (métodos CRU-31, SPL-22Y) y dividieron (método PUL-31). El análisis de oro, platino y paladio se realizó mediante ensayo al fuego de 50 g con finalización por ICP (método Au-ICP-24), y el análisis multielemental se llevó a cabo mediante digestión con 4 ácidos con acabado ICP-AES (método ME-ICP61). Las muestras con alta ley se analizaron mediante digestión con 4 ácidos con acabado ICP-AES (método ME-ICP-61). Los resultados de los metales comunes con una ley superior a la de referencia se analizaron mediante ICP-AES con digestión en cuatro ácidos (método OG-62). 

El estudio geoquímico de suelos incluye muestras recogidas de los 20 cm más superficiales (sin tamizar, con un peso aproximado de 1 kg) en una cuadrícula de 100 m x 40 m que abarca las zonas objetivo. Las muestras se enviaron al laboratorio de ALS en Sevilla para su preparación mediante el método PREP-41. Las muestras se tamizan a través de una malla de 180 micras para eliminar una gran parte de la arena de cuarzo y se envían a ALS en Irlanda para su análisis geoquímico mediante el método Au-ICP22 (Au; ensayo al fuego de 50 g). Más del 2 % de las muestras enviadas al laboratorio incluyen muestras en blanco, estándares de referencia certificados y duplicados de campo para garantizar el cumplimiento de los protocolos de control y aseguramiento de la calidad (QA/QC) de Pan Global Resources. ALS también lleva a cabo sus propios análisis internos de QA/QC para garantizar la correcta preparación de las muestras y la calibración de los equipos.

PARA MÁS INFORMACIÓN, POR FAVOR CONTACTE CON:

Jason Mercier, VP Investor Relations and Communications jason@panglobalresources.com / investors@panglobalresources.com 

Tel: +1-236-886-9518 www.panglobalresources.com

Declaraciones prospectivas

Las declaraciones que no sean de carácter puramente histórico constituyen declaraciones prospectivas, incluidas aquellas relativas a creencias, planes, expectativas o intenciones con respecto al futuro. Es importante señalar que los resultados reales y los resultados efectivos de la empresa podrían diferir sustancialmente de los expresados en dichas declaraciones prospectivas. La empresa considera que las expectativas reflejadas en la información prospectiva incluida en este comunicado de prensa son razonables, pero no se puede garantizar que dichas expectativas resulten correctas, por lo que no se debe confiar indebidamente en dicha información prospectiva. Los riesgos e incertidumbres incluyen, entre otros, factores económicos, competitivos, gubernamentales, medioambientales y tecnológicos que pueden afectar a las operaciones, los mercados, los productos y los precios de la empresa. Los lectores deben consultar la información sobre riesgos que se describe en el informe de gestión y análisis de los estados financieros auditados de la empresa presentados ante la Comisión de Valores de Columbia Británica. 

La información prospectiva contenida en este comunicado de prensa se basa en la información de que dispone la Sociedad a la fecha del presente comunicado. Salvo en la medida en que lo exija la legislación aplicable en materia de valores, la Sociedad no tiene intención de actualizar esta información prospectiva ni asume obligación alguna al respecto.

Login